In this new version, cost fields are available in the Tasks, Change Orders, Equipment Setup, Equipment Types, Labor Types, Item Catalog, and Item Kit areas of Smart Construction Field.
This cost data can be restricted within the Role Maintenance dialogue. Only users with SC Cost Visibility rights permitted in Role Maintenance will be able to see this data.
Users outside of the organization (extended team members) can now be invited to Smart Construction Field to log labor and equipment time.
Wage Type Support:
In Wage Type Maintenance, users can now associate a multiplier with special wage types. For example, double time would be the standard wage multiplied by two.
Reporting:
Payroll Reporting is now available as a customizable PDF report showing time entered with wage type by user, by project, by cost code.
Labor Time Log Detail View provides reporting as a PDF or CSV containing all details around labor time entries for the date range established.
Daily Cost Report gathers all costs associated with a project for the day and shares production progress as well.
Comments
0 comments
Please sign in to leave a comment.