Offline Data Access: As additional offline functionality is made available in the app, Smart Construction Field will be downloading data in preparation to go offline. If the data is still being downloaded, a downloading message will appear when accessing the project list. This message will not appear if all data has been successfully downloaded.
Open Time Entries: These entries that have been clocked into, but not out of, will now display the cumulative time for an open ended time entry. This is displayed on the Time Clock, Timecard, and Time Log.
Equipment Log: Operators now display for entries into the equipment's timecard. If multiple operators have worked with the machinery, that will be indicated.
Report Updates:
Cost Code Summary: This new report is now available in the app.
Formatting Changes:
Daily Reports now use the same Cost Code format used in the Daily Production Summary Report.
Production Summary reports will now display all numbers with two decimals.
Easier Access to Help: A link to the support site for Smart Construction Field can now be found under Help in the Main Menu.
Ticket Numbers Available in OCR: Optical Character Recognition (OCR) will now add a ticket number to a material delivery entry if one is present on the materials receipt.
Comments
0 comments
Please sign in to leave a comment.