This release (made available April 4, 2020) contains the following updates:
- Machine Log Enhancements: Entries can now edited (updating the project, task, notes, or cost code) and adjustments can be added to enter time for machinery that is not associated with a user's time entry via Bluetooth.
- Measurement Settings: Users can assign Imperial or Metric measurement systems to their Smart Construction Field settings.
- Main Menu Updates: The primary menu has been streamlined, making it more intuitive to navigate.
Comments
0 comments
Please sign in to leave a comment.